Integrated Fiber Cement Board Production Plant

Customization: Available
After-sales Service: Long-Term After-Sales Service
Warranty: 3 Years

Product Description

📋

Basic Information

Model NO.
AMFC001
Product Type
Fiber Cement Board Production Line
Automatic Grade
Automatic
Power Source
Electric
Screw Design
Double-Screw
Certification
CE, ISO
Condition
New
Forming Board Style
Hatchek Style and Flow-on Slurry Style
Asbestos
No Asbestos
Drying Style
Autoclave or Pressing Machine
Production Capacity
150 Sets Per Year
Specification
1220X2440X4MM-30MM
🏗️

Product Description

Fiber Cement Board Production Line

Main Production Line Specifications: LXWXT: 2440X1220X4-30mm (Custom specifications available per requirement).

Production Specifications
📊

Technical Performance Index

Item Unit Fiber Cement Board Value
Densityg/cm³0.75-1.8
Flexibilitympa>9
Thermal Conductivityw/m.k<0.29
Impact StrengthkJ/mm2>3.0
Screw Extraction Forcen/mm<0.2
Moisture Content%<10
Vertical Flexural Strengthmpa16-22
Horizontal Flexural Strengthmpa12-18
Average Flexural Strengthmpa14-22
Delamination-Non-Delamination
Moisture Movement%0.06
Shrinkage Rate%<0.09
Wet Expansion Rate%<0.19
Non-Combustibility-Comply With Gb8624A Class Non-Combustible
⚙️

Operational Specifications

Theoretical Capacity: 3,000,000-10,000,000 Sq.M Per Year (Based on 6mm thickness)
Pre-Curing Time: 8 Hours
Daily Production Time: 22 Hours
Autoclave System: 3 units (Φ2X26.5m), 24h continuous operation
Maintenance Cycle: 16 Hours on average
Raw Material Reserves: Fibers (7 days), Powder materials (3 days)
Process Image 1
Process Image 2
Process Image 3
Process Image 4
Process Image 5
Process Image 6
Process Image 7
Process Image 8
Process Image 9

Frequently Asked Questions

1. Are you a manufacturer or a trading company?
We are a manufacturer with 36 years of experience and an international trade team. We operate a 50,000 square meter manufacturing facility with approximately 150 workers.
2. Which loading ports do you use?
We can ship from major ports including Tianjin, Qingdao, Shanghai, Lianyuan Port, Shenzhen, and Guangzhou.
3. Can you provide customized equipment?
Yes, customized equipment can be provided according to specific customer requirements, including custom branding on machinery or packaging.
4. What are the standard payment terms?
Our typical terms are 30% advance payment, 65% payment before loading, and 5% payment within 30 days after installation.
5. What is the delivery time for the production line?
The delivery time is generally between 120 and 150 days.
6. Do you provide installation and commissioning services?
Yes, we have a global team of 50 engineers responsible for installation and commissioning, which typically takes about 90-120 days.

Related Products