1 / 5
| Still deciding? Get samples of $ ! US$ 1/Piece Order Sample |
| Traditional Asphalt Cold Bonding | High Viscosity Rapid Solidifying Waterproof Asphalt Cold Patch |
|---|---|
| 1. Long curing cycle: Surface layer doesn't cure quickly, leading to rutting, bulging, and cracking after traffic opening. | 1. Rapid solidification: Traffic can be opened immediately after compaction without ruts or swelling. |
| 2. Summer softening: Residual solvents from physical processes cause softening at high temperatures, requiring re-laying. | 2. Chemical transformation: Maintains performance from -20°C to 40°C. No softening in summer or cracking in winter. |
| 3. Post-rain scattering: High porosity allows water seepage, leading to material dispersion under vehicle traffic. | 3. Water resistance: Unique plasticizing characteristics make it ideal for rainy and humid climates. |
| 4. Standard heating required. | 4. Cold mixed process: No heating required, saving fuel costs and reducing carbon emissions. |
Cloverdyn Plant